Old Hall school

New Preparatory School - Old Hall School

Facts and figures

  • Client: Governors of Old Hall school
  • Project duration: 12 months

Interserve designed and constructed the new Preparatory School in the grounds of Wrekin College, Wellington, Telford, which caters for children from Nursery to age 13.

The striking semi-circular design, overlooking the sports fields and secure play area, provides a naturally-lit corridor along the whole length of the school. The classrooms have direct access to the play area and the roof overhang provides shelter during inclement weather.

The structure is a combination of single and two storey with both steel and insitu concrete frames, with large areas of curtain walling.

Achievements

  • Sustainability: Natural ventilation extract is provided at roof level and cooling is assisted by the structural mass of the building
  • A tight programme was achieved and the success of the project has led to the negotiation of a new facility for the adjacent Wrekin College