Industrial case studies
Areva T & D, Stafford
In May 2006, Interserve was awarded a £6 million facilities services contract for AREVA T&D’s three sites in Staffordshire, covering more than 52 acres and a total floor area of 645,289 square feet.
BAE Systems, Brough
Interserve provides total facilities management services at BAE Systems, Brough, home of the Hawk Fast Trainer Jet, the world’s most capable and cost-effective fast jet trainer.
BAE Systems, T45
Interserve provided all of the access, grit blasting and sub-contracted protective coatings services in the construction of six Type 45 Destroyer warships - HMS Daring, Dauntless, Diamond, Dragon, Defender and Duncan.
BP Dimlington Plant
The BP Dimlington Gas Terminal is situated in the north east coast of England. It is a critical link in the gas supply into the UK and as a consequence integrity and reliability are not negotiable.
BP Petrochemicals, Hull
With an annual production capacity of over 1.5 million tonnes and covering 370 acres, the Saltend Chemical Park in Hull is a strategic part of BP’s worldwide operations.
i-plan management system
Interserve has invested heavily in management systems in recent years and can now offer best-in-class work processes and tools to support our activities on site.
Industrial development, Bootle
In constructing 21 hybrid industrial units for Priority Sites in Bootle, Interserve has played a key role in incorporating renewable energy sources as well as minimising disruption to local people.
Qatar Shell
From training to maintenance
Pearl Gas to Liquids (GTL), a project jointly developed by Qatar Petroleum and Shell, is the world's largest gas-to-liquids plant with peak capabilities of converting 1.6 bcf of natural gas per day into 140,000 barrels per day of cleaner-burning liquid transport fuel and other liquid products and 120,000 barrels per day of natural gas liquids and ethane.
SembCorp Utilities, Wilton
Among SembCorp’s assets are the Wilton Power Station - a 197 MW combined heat and power (CHP) plant capable of producing up to 600 tonnes of steam an hour - the Wilton Water Treatment Plant which supplies up to 2,000 cubic metres of demineralised water an hour (the largest such water facility in the UK) and cable and pipe work distribution systems for electricity, steam, compressed air, nitrogen and water.


