Refurbishment of Albert Bridge

    iaw-hero-header

Refurbishment of Albert Bridge

Refurbishment of Albert BridgeThe Albert Bridge, a historic, Grade II Listed structure, is not only a major route for traffic, but also enables over 3,000 pedestrians a day to cross the river. The bridge also sits in close proximity to residential properties and houseboats.

The Interserve team faced some interesting challenges on what was a very high profile project.

Creating a bridge for the 21st century

Firstly, the bridge deck was removed in sections to expose supporting metal. Works then included metalwork repairs and re-painting prior to replacement of the timber bridge deck.

The complexities of carrying out this work over water meant encapsulation tents were erected to prevent contamination by water and paint removed via grit blasting. The facelift also comprised new road markings, signs, street lighting and electrical installations to make the transformation complete.

Reaching out to the community

Keeping people in touch with the project was always a key consideration. With full pedestrian access created over the bridge via a protected timber tunnel, viewing points in the tunnel itself encouraged people to watch work progressing. Bringing in support from the Metropolitan Police and London Fire Brigade reinforced the message on public safety. Neighbours on land and water were briefed via meetings and news updates.

Leaving a future legacy

Pupils from the local Christ Church School also engaged with the project – visiting site and helping to choose items for a time capsule. The said capsule remains hidden under the bridge deck and awaits discovery when the bridge undergoes its next refurbishment in years to come.

Upgrading a London landmark for the 21st century - refurbishing and strengthening the iconic Albert Bridge across the Thames.

Client:

Royal Borough of Kensington & Chelsea

Location:

Albert Bridge, River Thames

Value:

£6 million

Date:

2010


Want to know more? send us a note here and we'll be in touch

*denotes mandatory field

There was an error submitting the form. Please try again.

Thank you. Your message will be with us shortly.
If you wish to write us another message please go back.
We will be in touch soon.

Civil engineering

Whatever the complexity of the engineering challenge, Interserve will advise, design and build projects - from roads and bridges to waterworks and power stations.

Construction

We carry out every aspect of a project, from financing, design, development and construction to after-care and facilities management.

Consulting

Operating nationally and internationally, we deliver a range of consultancy and professional services for clients.



Latest Insight


Discover
SustainAbility

What are the benefits of building to Passivhaus standard?

Discover
#Passivhaus built Richmond Hill Primary School in Leeds uses 80% less energy than normal build schools #construction #ingenuityatwork
Publication 2017 half-year report Download