Interserve was appointed to design and deliver the The Campus Technology Hub (CTH) a purpose-built engineering facility in Daresbury, Cheshire.

The project involved the demolition, refurbishment and extension of a dated production facility to deliver a modern technology hub. 

The works included:

  • Removal of asbestos
  • Cladding
  • Glazing
  • M&E
  • Lighting
  • Floating ceiling
  • Re-roof
  • Hard & soft landscaping

The building provides a focal point where businesses, universities and research organisations can work in partnership to tackle engineering challenges. The CTH aims to provide an affordable mechanism for entrepreneurs and others to access an impressive array of technologies, equipment and expertise, eliminating the need to develop, buy or pay prohibitively high prices to use engineering research and development capabilities.

Construction logistics

The project was constructed alongside the Bridgewater Canal, so careful planning was required to avoid pollution incidents.

The live site demanded minimal disruption. Interserve applied ‘just in time’ principles for the delivery of materials to site. This is a process that helps to ensure the efficient handling of materials, by providing the right materials, in the right quantities and quality, just in time for production. Materials may be delivered to site on the actual day of use or the day before. Deliveries were booked in advance and a number of holding points were identified off site. Interserve liaised with the client’s security team before deliveries were called to site to service current tasks. 

There were no accidents, and the works did not impact on, or disrupt the operational technology park.

Sustainability

81 per cent of orders were placed with supply chain partners located within a 50 mile radius of the site, of which 78 per cent were within a 20 mile radius.

Innovation

Interserve challenged the design to provide cost and time savings. Changing the floating mezzanine floor to a fixed concrete floor reduced the programme of works by four weeks and provided an alternative landscaping solution to the original specification.

The project was delivered on time, to a high quality and to budget, despite incorporating £150k of client variations.

81 per cent of orders were placed with supply chain partners located within a 50 mile radius of the site, of which 78 per cent were within a 20 mile radius.

Project vitals

Location:

Cheshire, England

Client:

The Science & Technology Facilities Council

Value:

£2.5 million

Duration:

April 2014 - November 2014

 

 

 

 


Want to know more? send us a note here and we'll be in touch

*denotes mandatory field

There was an error submitting the form. Please try again.

Thank you. Your message will be with us shortly.
If you wish to write us another message please go back.
We will be in touch soon.

Building services

Providing intelligent solutions from design, procurement, installation, offsite manufacturing, commissioning and ongoing aftercare to building maintenance.

Construction

We carry out every aspect of a project, from financing, design, development and construction to after-care and facilities management.

Consulting

Operating nationally and internationally, we deliver a range of consultancy and professional services for clients.



Latest Insight


Discover
SustainAbility

What are the benefits of building to Passivhaus standard?

Discover
#Passivhaus built Richmond Hill Primary School in Leeds uses 80% less energy than normal build schools #construction #ingenuityatwork
Publication 2017 half-year report Download