Please refer to our Privacy policy for important information on the use of cookies. By continuing to use this website, you agree to this.

Search Results

Interserve wins £10m contract at one ...

August 17th, 2011

Interserve wins a £10m contract to provide mechanical and process engineering services.

Interserve appointed to CE Electric U...

July 6th, 2011

Interserve has been appointed to two framework agreements with CE Electric UK, the company responsible for delivering electricity safely and reliab...


LATEST INSIGHT

Explore our Latest Insight for further blogs, videos and research.

Boston Haven Flood Defence Scheme - New Flood Wall Installation

In 2013, Boston experienced the worst floods in its history. Interserve were contracted to install a new 240m long sheet piled wall in front of the existing.

Truro Flood Defence Scheme

The Truro Tidal Defence Scheme involved replacement of a 296m length of the tidal quay with a sheet pile wall supported by ground anchors, and a cathodic protection sy...

Minsmere Flood Risk Management Scheme

The construction of a large new cohesive embankment with a central flow control structure, sheet piling, working within marshland and significant access constraints

Anglian Reconditioning Framework

Maintenance of the Environment Agency’s assets to manage flood risk and comply with legislation

Harwich Flood Barriers

To refurbish the Harwich Town Floodgates using our technical skills and experience to overcome any physical challenges and provide the best results we can.

Whittlesey Washes Flood Reservoir

5.5km of earthworks strengthen an existing reservoir embankment

Improving traffic flow and water drainage on two roundabouts

To improve traffic flow on the A38 at the Markeaton roundabout and Little Eaton roundabouts.

Refurbishment of Albert Bridge

Upgrading a London landmark for the 21st century - refurbishing and strengthening the iconic Albert Bridge across the Thames.

More skills, more opportunities at Khansaheb Training School, Dubai

Interserve’s associate civil engineering business in Dubai is paving the way with the establishment of its own in-house trades training school.

Innovation drives success of Jaguar Land Rover engine plant project

Interserve used cutting edge Building Information Modelling (BIM) technology to design and build Jaguar Land Rover’s (JLR) new Engine Manufacturing Centre near Wolverh...

A43 Corby Link Road

The construction of 6.5km of new dual carriageway, across green fields and three over-bridges, one box culvert and four minor culverts.

A1 Peterborough to Blyth

Design and construct in order to reduce congestion and improve safety.

Doha West Sewage Treatment Works

State of the art plant using modern processes such as Ultra-Filtration.

A66 Long Newton grade separated junction

Design and construction of the £12 million grade-separated junction.

A5 Weeford to Fazeley improvements

Replacing the last single carriageway stretch of the A5 between the M42 and A38.

A38 Dobwalls Bypass ECI

Design development of the A38 Dobwalls Bypass scheme, followed by detailed design and construction of the 4km dual carriageway.

A30 Merrymeet junction improvements

Design and construction of a new bridge to form grade separation over the existing A30 in Devon.

Environment Agency

Ripon flood defence scheme

Asset Support Framework North and South

Interserve secured a position on both of the Highways Agencys’ ASF North and South.

Birba gas injection project

Boosting production by high pressure/high sour gas injection.

Temporary Traffic Management Framework

Interserve secured the Highways Agency Category Management Framework contract.